“Bag for Mastlift” has been added to your cart. Continue shopping
Cart totals |
---|
Cart totals
Subtotal | CHF 535,22 (incl. tax) | ||
---|---|---|---|
|
|||
Total | CHF 544,95 (includes CHF 40,84 MwSt. CH) | ||
incl. 8,1% VAT | CHF 40,84 |
Cart totals |
---|
Subtotal | CHF 535,22 (incl. tax) | ||
---|---|---|---|
|
|||
Total | CHF 544,95 (includes CHF 40,84 MwSt. CH) | ||
incl. 8,1% VAT | CHF 40,84 |
All prices incl. VAT.
All striked out prices refer to prices used to be charged at this shop.
Delivery time: 3 - 7 days
Diameter:
for 25mm rail tubes
Weight:
250 g
Material:
Plastic, Stainless steel V4A
Delivery time: 3 - 7 days
Weight:
0,8 kg
Dimensions:
400 x 250 x 250 mm
Material:
hochwertige Baumwoll – Polyamid – Mischung mit Schaumstoffeinlage
Delivery time: 3 - 7 days
Material:
Cotton-polyamide blend; water resistant wooden plank (20mm thick)
Passenger load capacity:
150 kg
Breaking Load:
2100 kg (Tragleine)
Delivery time: 3 - 7 days
Weight:
0,8 kg
Dimensions:
400 x 250 x 250 mm
Material:
hochwertige Baumwoll – Polyamid – Mischung mit Schaumstoffeinlage
Subtotal: CHF 535,22 (incl. tax)
incl. 8,1% VAT: CHF 40,11
plus shipping costs
Switching language?
You've switched the language and there are items in the cart. If you keep the English language, the cart will be emptied and you will have to add the items again to the cart.