“Prohibited anchoring decal for your anchor buoy” has been added to your cart. Continue shopping
Cart totals |
---|
Cart totals
Subtotal | CHF 1.878,20 (incl. tax) | ||
---|---|---|---|
|
|||
Total | CHF 1.887,93 (includes CHF 141,47 MwSt. CH) | ||
incl. 8,1% VAT | CHF 141,47 |
Cart totals |
---|
Subtotal | CHF 1.878,20 (incl. tax) | ||
---|---|---|---|
|
|||
Total | CHF 1.887,93 (includes CHF 141,47 MwSt. CH) | ||
incl. 8,1% VAT | CHF 141,47 |
All prices incl. VAT.
All striked out prices refer to prices used to be charged at this shop.
Delivery time: 3 - 7 days
Material:
Cotton-polyamide blend
Passenger load capacity:
150 kg
Weight:
1,8 kg
Delivery time: 3 - 7 days
Length:
20 m Polyester strap
Material:
Stainless steel, Plastic
Diameter:
300 mm
Height:
420 mm
Breaking Load:
500 kg (strap)
Delivery time: 3 - 7 days
Width:
50 mm (strap)
Material:
100% Polyester
Breaking Load:
1000 kg
Delivery time: 3 - 7 days
Length:
4 m
Diameter:
Rope 10 mm spliced
Delivery time: 3 - 7 days
Diameter:
for 25mm rail tubes
Weight:
250 g
Material:
Plastic, Stainless steel V4A
Delivery time: 3 - 7 days
Art. No.:
1004
Length:
4 m
Diameter:
Rope 10 mm spliced
Delivery time: 3 - 7 days
Art. No.:
1005
Size:
for 13 m (45 ft) and 25 m (82 ft) mastlift
Material:
7 mm Neopren
Delivery time: 3 - 7 days
1 × CHF 334,96Delivery time: 3 - 7 days
Weight:
0,8 kg
Dimensions:
400 x 250 x 250 mm
Material:
hochwertige Baumwoll – Polyamid – Mischung mit Schaumstoffeinlage
Delivery time: 3 - 7 days
Art. No.:
1003
Length:
700 mm
Material:
Balls of beechwood, 4 mm steel cable
Delivery time: 3 - 7 days
Width:
50 mm (strap)
Material:
100% Polyester
Breaking Load:
1000 kg
Delivery time: 3 - 7 days
Art. No.:
2041
Subtotal: CHF 1.878,20 (incl. tax)
incl. 8,1% VAT: CHF 140,74
plus shipping costs
Switching language?
You've switched the language and there are items in the cart. If you keep the English language, the cart will be emptied and you will have to add the items again to the cart.